The Eurotunnel between France and UK is an extremely busy tunnel which is operated by trains. To create more loading and unloading capacities on the French´side, it has been decided to extend the loading and unloading platforms. Therefore, CeTeau hs been asked by its French agent Inclusol to install wick drains to a depth up to 8,00 meters below platform.

Project Data

Location : Calais
Product : Vertical Wick Drain, CT-D1008
Country : France
Quantity : 150,000
Client : Eurotunnel
Period : 2019