With CeTeau´s unique and specifically designed PVD rig, the high voltage power lines crossing the road alignment, do not form an obstacle to install our vertical wick drains.
The PVD project contributed to an important bridge-link with a total length of 7.3km, connecting Tanjung Bin to Tanjung Pelepas in Johor, Malaysia. The bridge-link will shorten the transportation of goods and will play an important role in promoting the development of Pontian, Kukup and the surrounding areas in Malaysia.