This challenging project was carried out in in the area of Map Tha Phut where Thailand´s largest industrial park is located. CeTeau´s scope of work included the ground improvement with stone columns under the footprint of full storage tanks. We installed a total of 2,605 stone columns with an installation depth varying from 6.5 to 12 meters. The improved soil enabled the tank farm to increase its fuel storage capacity.